Case Study

Burton Mill Pond

  • Client:May Gurney
  • Location:Burton Park Road, Petworth
  • Project Duration:9 months
The installation of twin concrete box culverts, on a site of special scientific interest. The flood alleviation project is to act as an overflow from an existing pond to protect the highway and surrounding properties from flooding.
 

Scope of works:

  • Asphalt and Macadam Surfacing

  • Box Culverts

  • Bridges

  • Bulk Earthworks

  • Concrete Structures

  • Hard/Soft Landscaping

  • Reinforced Concrete Roads and Slabs

  • Retaining Structures

  • Contact us