Case Study

Horndean

  • Client:Brymor
  • Location:Horndean
  • Project Duration:11 Months
Southern distribution centre for Fullers Brewery.
 

Scope of works:

  • Access Roads

  • Asphalt and Macadam Surfacing

  • Bulk Earthworks

  • Concrete Structures

  • Connections to Public Sewers

  • Foulwater Drainage Systems

  • Hard/Soft Landscaping

  • Industrial Concrete Floors

  • Local Authority Adoptable Highway Access Work Sections 106, 38 and 278

  • Reinforced Concrete Roads and Slabs

  • Surface Water Drainage Systems

  • Water Main Installation