Case Study
Horndean
- Client:Brymor
- Location:Horndean
- Project Duration:11 Months
Southern distribution centre for Fullers Brewery.
Scope of works:
Access Roads
Asphalt and Macadam Surfacing
Bulk Earthworks
Concrete Structures
Connections to Public Sewers
Foulwater Drainage Systems
Hard/Soft Landscaping
Industrial Concrete Floors
Local Authority Adoptable Highway Access Work Sections 106, 38 and 278
Reinforced Concrete Roads and Slabs
Surface Water Drainage Systems
Water Main Installation