Down Arrow

Deep Drainage

(Civil Engineering & Infrastructure)

Location: Shopwyke

Construction of New adoptable pumping station and foul water attenuation with capacity for 600 houses (Duration: 6 Months)

Scope of Works

Adoptable FW Pumping Station 6m Deep

Bulk Earthworks

Drainage up to 6m Deep

Foulwater Drainage Systems

Local Authority Road Openings Section 50 Works

Reinforced Concrete Slabs

Road Construction including Macadam Surfacing