Down Arrow

Manufacturing

(Construction)

Location: Pulborough

Design and build of a new main brewery, 3 microbreweries and bottling plant on a greenfield site for Hepworth Brewery. The high specification construction involved resin coated power floated floors laid to falls into a bespoke marine grade stainless steel drainage system. (Duration: 9 Months)

Scope of Works

Bulk Earthworks

Foundations and Oversites

Industrial Concrete Floors

Local Authority Adoptable Highway Access Work Sections 106 38 and 278

Package Pumping Stations

Porous Car Parks and Loading Yards

Sewage Treatment Plants

Stainless Steel Foul Water Drainage Systems

Steel Frame and Cladding

Surface Water Drainage Systems and Attenuation Systems